1.The heating element is MoSi2 bar, whose max. operation temperature is 1600℃。
2.The heating-up time from the room temperature to the max operation temperature is no more than 60mins or 80mins。
3.The precision of temperature control is no more than ±1℃。
4.The diameter of furnace covers 40mm to 100mm,and the heated length is between 400mm to 600mm。
5.The excellent ceramic textile fiber inner line and suitable furnace structure ,is able to reduce the consumption of power greatly ,the heating consumption is only60%to the conventional furnace ,and the consumption of power is only 50-60%to no-load furnace。
6.A corundum tube is attached for the protective gas
7.The controller is equipped with SCR/PID to set the heating rate, which makes it possible for the consistency and repeating of any experiment。 Interface RS485 help the customers to control the furnace and record the data in long distance。
8.The connection between furnace body and electric controller has been completed before leaving plant ,and the products can be put into work after the power is on. |
|