user login

Best sale rainball inflatable bouncy castle

300.0~2000.0 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB
Payment Terms: T/T, WU
Supply Ability: 1000 Pieces / Month
Place of Origin: Henan

Company Profile

Location: China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: Obstacle002
Means of Transport: By ship or by Airplane
Age: Others
Brand Name: Bigjoys
Material: 0.55mm PVC
Size: complying with Customers' Requirements
color: optional
Workmanship: Double to Quadruple stitches throughout the whole structure
Packing: Blanket(inside pack)+PVC Tarpaulin bag(Outer side)
Delivery: By ship or by Airplane
Blower: Free CE/UL blower
OEM/ODM: Acceptable
port: Any China port
Accessory: Repair patches,Glue
Production Capacity: 1000 Pieces / Month
Packing: Blanket(inside pack)+PVC Tarpaulin bag(Outer side)=
Delivery Date: 7~15 days or according to your order quantity
Show

Product Description

Inflatable bouncy castle
1. Material:1000D,18Oz PVC tarpaulin,0.55mmthick PVC Tarpaulin,650g/m2.Fire-Retardant,Anti-UV.
2. Thread:Non-rotting Yarn with 90N Tensile Strength.
3. Workmanship: Double to Quadruple stitches throughout the whole structure..Norms NEN 14960 Standards-Safety Guaranteed.
4. Size: The size can be made larger or smaller complying with Customers' Requirements.
5. Packing:Blanket(inside pack)+PVC Tarpaulin bag(Outer side)=double protection to the goods.
6. Delivery:By ship or by Airplane (Decided by customers)
7. Blower: The inflatable Bouncer will come with CE/UL blowers for free
8. Accesory:Repair patches,Glue.
9. OEM/ODM :Business is acceptable.
10.Special Advantages:
         (a) Air Inlet Connection tube: 1.5mLong Far away from entrance. with Velcro Cover.a non-return flap is inserted at the joint of connection tube and structure to lengthen the deflation time,In the event of air supply failure,the deflation time will be sufficient to allow users of the inflatable to be evacuated safely.
         (b)Air Outlet : Quick Deflation--1 meter long Zip out with velcro flap.
5~15 days or according to your order quantity
Post Buying Request