user login

Duplex Hotel Passenger Elevator

14000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 500 units one month
Place of Origin: Jiangsu

Company Profile

Location: Wuxi, Jiangsu, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Escalator, Elevators

Product Detail

Model No.: CP22
Means of Transport: Ocean
Brand Name: SANYO
Production Capacity: 500 units one month
Packing: wooden cases
Delivery Date: 40 days
Show

Product Description

SANYO automobile elevator applies industry-leading permanent magnet synchronous technology, by energy conservation and environmental protection and remarkable drive performance, it saves architectural space and cost, providing elevator solutions of high space value to high-rise residential buildings, office buildings, hotels, office, schools and various public places.

2. Standard decoration
1. VVVF drive
2. VVVF drive for door operator
3. Independent running
4. Full load automatic bypass
5. Door open time automatic adjusting
6. Reopen with hall call
7. Express door closing
8. Car stops and door opens
9. Registered car call cancel
10. Direct parking
11. Light curtain protection
12. Designated stop
13. Overload protection
14. Anti-stall timer protection
15. Start protection control
16. Inspection operation
17. Fault recording
18. Repeated door closing
19. Up/down over-run and final limit protection
20. Downward overspeed protection device
21. Upward overspeed protection device
22. Micro-touch button for car call and hall call
23. Floor and direction indicator
24. Emergency car lighting
25. Inching running
26. Five way intercom
27. Bell
28. Fire emergency return
29. Car ventilation, light automatic shut off
30. Shut-off keyswitch on ground floor

 

4. Packing:
To be packed in strong wooden cases, suitable for long distance ocean transportation and well protected against dampness, moisture, shock and rust.


5. Payment Term:
The buyer shall pay 30% as the down payment of the total contract value by T/T to the Seller' account within 7days after specification, layout confirmed and contract signed.
The buyer shall pay the balance 70% of the total contract value by T/T to the Seller' account 15 days before shipment.

 


Post Buying Request