Min. Order: | 300 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, D/P, D/A, T/T |
Supply Ability: | 1000pcs per month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | WF YJ |
---|---|
Means of Transport: | Ocean, Air, Land |
Part: | Shaft |
Brand Name: | WF |
OEM No.: | China OEM |
Application: | Industry Machine |
Surface finish: | Heat treatment & rust prevention |
Package: | PVC bag + Plywood box |
Place of Origin: | China |
Material: | Steel 1045 / C45 |
MOQ: | 300pcs |
Production Capacity: | 1000pcs per month |
Packing: | PVC bag + Plywood box |
Delivery Date: | 50~60 days |
------Photo of Heavy Duty Cardan Shaft (SWP/SWC)
Product Introduction
Heavy Duty Cardan Shaft (SWP/SWC) Used for Industry Machine.Meet TS/ISO16949 quality certification.High intensity and rigidity ,competitive price, excellent performance and long using life.
Name | Heavy Duty Cardan Shaft |
Qualityguarantee | ISO9001:2000, ISO/TS 16949 |
Use for | Use forautomobile, agricultral machine, water machine, andso on |
nylon coatedon spline | |
Material | Steel 45#,60#; As per customer's requirment |
Productionstandard | Accordingdrawing or sample to manufacturing. OEM isavailable too |
ManufacturingMethod | Casting orforging; machining; |
Surfacefinish | Heattreatment; rust prevention |
Inspection | Theproduction is inspected OK befor package, |
InspectionMethod | Assemblyshaft with dynamic balance test to avoid virbration |
Spare partscheck measurement | |
LOGO onproduct | Neutral withno logo, or as per customer's requirment |
Painting | Black /yellow/Red color paint against rust |
LOGO onpackage | Neutral packing, or as per customer's requirment |
Packagematerial | PVC bage +cartons + PLYwooden boxes, or as per customer's requirment |
Otherreletive assemble shaft & spare parts please check our website | |
or sentmessage to me directly, we will reply you soon. |
OEM are welcome.
SWP/SWC codes are available.
Your sample or drawing request are welcome.
Packing:
1st step: Upon inspection and test, the parts will cleaning and oiling
2nd step: Put in neutral white PLASTIC BAG
3rd step: A: Rank the parts in the PLY-WOODEN box (around 1cubic metre)
B: Parts in paper box, then put in ply-wooden box
4th step: Cover lid of PLY-wooden box -- Bind -- stick the shipping mark -- wait to shipping