user login

API 5L X52 MATERIAL 14" XS steel pipe

1.0~999.0 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 1,118,000 Ton/Tons per Year
Place of Origin: Hebei

Company Profile

Location: Cangzhou, Hebei, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: ANSI Forged Stainless Socket Welding Flange, ANSI Forged Stainless Threaded Flange, ANSI Forged Stainless Steel Blind Flange, Concentrice Redueer Sch 5s BW ASTM A 403 WP304 MSS SP43, ANSI Forged Stainlessplate Flange

Product Detail

Model No.: 355.6*12.7*5800
Means of Transport: Ocean, Air, Land
Special Pipe: Thick Wall Pipe: The Third Party Inspection
Transparent oil or black painting anti-corrosion: Certification: API,ISO9001,API
Color:: black,oil
Section Shape:: Round
Production Capacity: 1,118,000 Ton/Tons per Year
Packing: as the expore standards package
Delivery Date: Usually within3~ 20 days or as customers require
Show

Product Description

 We are Hebei Gee Pipe Mill Co., Ltd. which is located in Mengcun County Cangzhou City Hebei Pro. China. Our company was established in 1982. It has a long history in manufacturing.

We own many advanced production line, equipment and introduce the latest technique to manufacture steel pipe. About pipe fitting,we can produce elbow ,tee ,reducer and caps.Our products conform to the standard of ANSI ,DIN, JIS,BS,EN GOST and also can do that by your requirement.
Production
ASTM A106 Seamless Steel Pipe
SCH10-XXS
Brand
Hebei Gee Pipe Mill Co. Ltd.
Standard
ASTM ,API5L,ASME,ANSI,GB,DIN,JIS,BS,etc.
Out Diameter
1/2"--24"
Wall Thickness
SCH5--SCH××S
Grade
10# 20# 45# 16Mn A53 A106 A269 A312 A179-C A213 Q195 Q215 Q235 Q345
Length
5.8m--11.8m or according to customer's requirementv.
MOQ
5 tons
Plade of Origin
China
Port
Tianjin Xin Port
Technique
Usage
1.Low and middle pressure fluid transportation pipeline
2.Casing Tube
4.Petroleunm and natural gas industry
5.Chemistry industry
6.Electric industry
Package
1.Bundle packing.
2.Bevelled end or plain end or warnished as per buyer's requestments.
3.Marking: as per customer's requests.
4.Painting varnish coating on the pipe.
5.Plastic caps at ends.
Delivery Time
15-30 days or as clients reqestments.
Supply
5.  hot-rolled steel pipe






Post Buying Request