user login

PV cable for solar connector

1.0 USD
Min. Order: 250 Meter
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 5000meters/day
Place of Origin: Jiangsu

Company Profile

Location: China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: RO-PVC
Means of Transport: Air
Type: Others
Material: Copper
Brand Name: REOO
Standard: TUV
inside diameter: 2.5mm2~35mm2
suitable: solar power system
Production Capacity: 5000meters/day
Packing: 250meters/roll
Delivery Date: 3-7work days after T/T payment
Show

Product Description



PV cable for solar connector

1.Applied for solar system connection
2.UV-Proof, more than 25 years life
3.TUV and UL approval  

Cross section (mm2)
Conductor construction (n/mm)
Conductor stranded OD.(mm)
Cable OD.(mm)
Conductor Max.Resistance AT 20℃( Ω/km)
Current Aarring Capacity AT 60℃(A)
1x1.5
30/0.25
1.58
4.90
13.3
30
1x2.5
49/0.25
2.02
5.45
7.98
41
1x4.0
56/0.30
2.60
6.10
4.95
55
1x6.0
84/0.30
3.42
7.20
3.30
70
1x10
84/0.40
4.56
9.00
1.91
98
1x16
128/0.40
5.60
10.20
1.21
132
1x25
192/0.40
6.95
12.00
0.780
176
1x35
276/0.40
8.74
13.80
0.554
218

Main speciality
1.Temperature range for application -40℃ up to 90℃, max.temperature at conductor 120℃
2.Electron beam corss-linked material does not melt or flow at high temperatures
3.The permitted short-circuit-temperature refer to a period of 5s is 200℃
4.High resistance against UV,ozone and hydrolysis
5.very high machanical robustness and resistance against water,oil and chemicals
6.Flexible,easy to strip
7.Pass the flame test on single vertical insulated wires,high class of flame ratardant

Package:
1.250meter a roll
2.2 rolls in a carton
3.Carton dimension:42cm*42cm*21cm
4.Net weight:35kg
5.Gross weight:36kg

Shipment:
1.we ship to world wide
2.Most orders ship within 1-7 business days on payment received(except holiday)
3.Item shipped from China mainland using airmail by EMS,UPS,DHL,TNT or Hong kong Post  Office,reach most of the countries within 6 to 14 business days.
4.Delivery time depends on destination and other factors,it may takes up to 20 business days.
5.After we ship the item,we will email you the shipping information,as well as the tracking number.
6.If it happens to be any duties,taxes and any other fees charged by the courier company and your respective country,the buyers are duty to pay.
Post Buying Request