user login

Hollow Shaft Magnetic particle brake

250.0 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB,CIF
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU
Supply Ability: 5000 pcs
Place of Origin: Guangdong

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer
Main Products: Magnetic Particle Brake, Magnetic Particle Clutch, Safety Chucks, Powder Brake, Powder Clutch

Product Detail

Model No.: POB
Means of Transport: Ocean, Air
Plate: Screen Printer
Type: Heat Transfer
Color & Page: Multicolor
Usage: Paper Printer
Brand Name: Sunrise
colorc: gray
Material: stainless steel
Rated Voltage: DC 24V
Warranty: 18 Months
Lead Time: 1-3 Days
Brand: Sunrise
Production Capacity: 5000 pcs
Packing: normal export carton
Delivery Date: 7-10 days
Show

Product Description

Magnetic brake wholesaler

 

POB Attention for using magnetic powder brake:

 

1, Install it with correct mounting method (make high-speed rotation side as the input side) to use the magnetic powder clutch. If the mechanical structure of output and input shafts have to be installation reversely, make sure to use the under 1000R/MIN. If the output shaft and input shaft be installed reversely, which will make the machine idle for a long time,  the magnetic powder clutch will greatly shorten the life by mixing magnetic powder. 

2, Note the moisture. If the magnetic is damp, then performance will become unstable, so be careful do not to let the oil or water get into the housing. Especially when installed in the gear box, oil penetrated the internal branch of the housing through the shaft, so please seal it with film completely.

3, Note the surface temperature. Caused by continuous operation, the maximum temperature of the surface is below 90 degree when running more, than the value and durability will be greatly reduced. Make sure to limit the temperature will not above90 degree, make sure to keep the use of sliding within allowed work range.

 

Magnetic powder brake data:


ModelPOB-006POB-015POB-025POB-050POB-100POB-200
Rated torque[kgf-m](N-m)0.6 (601.2(1202.5 (25)5 (50)10(100)20(200)

Capacity 

DC 24V

(75°C)

Current (A)0.30.390.730.941.211.9
Power (W)7.29.417.522.628.845.6
No. of hour set (S)0.100.130.150.170.300.60
Weight (kg)2.75.2914.53753
Maximum speed (r/min)1800
Weight of powder (g) 1425 39 60 117 255 

Exterior

Dimension

L1688898115136160
L253586674107113
L3152628272941
L4255556
L5648693110130152
L6425568
D1140160185230280346
D2116144170195250320
D380100140150150240
D4(g7)7074100110120160
PM5*12LM6*17LM10*19LM10*19LM10*22LM10*30L
d(H7)121820303545
W(F8)4568 / 71014
T13.5202233385.549


Still frustrated about your powder brake, powder clutch, air shaft or safety chucks, tension controllers? And looking for available and enduring ones with warranty?

 

You've come to the right place!

 

Established in 2003 and located in Dongguan city, SUNRISE GROUP INDUSTRIAL CO., LTD is a professional manufacturer and trader of powder clutches, powder brakes, electromagnetic clutches, electromagnetic brakes, air clutches, air brakes, air shafts, safety chucks, rollers and tension controllers. You name it, we specialize in it!

 

1.    When can I get the quotation?

 

We usually quoted within 24 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority.

 

2.    How should I place the order?

 

Please let us know the model number based on our specs for powder clutch, powder brake, air clutch, air brake, electromagnetic clutch, electromagnetic brake and safety chucks. For air shaft and roller, please show us your drawing, or let us know your request, and then we will provide you drawing for confirmation.

 

3.    What's your MOQ basis?

 

Normally, we don't have MOQ request, except the rollers.

 

4.    What about the lead time for production?

 

Honestly, it depends on the order quantity and the type of our products. For powder clutch, powder brake, tension controller, load cell and edge position controller which is about 3-5 days. For safety chucks, air shaft and roller which need about 15-30days.

 

5. What is the term of delivery?

 

We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.

 


Post Buying Request