user login

M5 thread air handling unit pricesair filter regulator Custom-made

13.8 USD
Min. Order: 5 Piece/Pieces
Trade Term: EXW
Payment Terms: T/T, WU
Supply Ability: 10000Sets/month
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Model No.: AC1010-M5
Means of Transport: Ocean, Air
Brand Name: SUPERMECH
Material: aluminum alloy
Type: custom-made
Testing: 100% testing
Production Capacity: 10000Sets/month
Packing: Cartons/Pallets
Delivery Date: 15-30Days
Show

Product Description

Product: air filter regulator

Model:AC1010-M5


AC1010-M5 air prepare unit filter element china Custom-made

ModelCAC 1010-M5
Rated Flow90
Joint Pipe BoreM5
Filter Precision25μm
HighestWorking1.0MPa
Pressure
Ensured Pressure1.5MPa
Resistance
Operating Temperature Range5~60'C
Range of Adjustment Pressure0.05~0.7MPa
Recommended oil UseISO VG 32
Container MaterialPolycarbonate
Protective CoverNot Available
Drain FunctionDifferential Drain
Vakve TypeWith Overfkiw


AC1010-M5 air prepare unit filter element china Custom-made
AC1010-M5 air prepare unit filter element china Custom-made

FRL use and maintenance

a. working medium to the use of clean and dry compressed air, and the air inside the pipe to prevent impurities into fully purge the system caused by the cylinder, valve malfunction, requiring lubrication piping systems in add lubricator is recommended to use lubrication oil is a transparent oil No. 1 (ISOVG32).

b. Normal system operation, to regularly check the air filter, lubricator work, and timely drainage (except automatic drain), refueling

c. Cylinder and valve when for long time not to use, pay attention to the   minimum operating frequency of 1/30 days

d. Always check the operation of various pneumatic components, check the connection screws loose? Components for damage seal leakage phenomenon? Identify problems and timely treatment

e. Maintenance, be sure to turn off gas supply in advance, and the compressed air piping system maintenance operations can be carried out after emptying to prevent accidents

f. Component overhaul complete reassembly parts must be cleaned, and other impurities can not be brought within the system


Post Buying Request