user login

acoustic mineral fiber ceiling tiles

1.6~5.0 USD
Min. Order: 2000 Square Meter
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 160000 per week
Place of Origin: Anhui

Company Profile

Location: China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: M128
Means of Transport: Ocean
Material: Others
Performance: fire/moisture proof and sound absorption
Thickness: 12mm-20mm
Size: abnormal sizes avaliable
Edge: precise tegular and concealed edges
Pattern: stylish and different signs avaliable
Density: low density,180kg/m3-260kg/m3
Production Capacity: 160000 per week
Packing: inside covered with imported PVC shrink film,outside packed by cartons
Delivery Date: 15 days after receiving deposit or sight L/C
Show

Product Description

 Campo(without pin-holes)
this pattern is similar as Armstrong's Dune 
FEATURES
High light-reflectance
Nondirectional pattern designed ,easy installation
Fire-resistance
Adopt high quality mineral wool,100% ,asbestos-free
Ligh-weight and easy to be cut.
Withstand condition with relative humidity up to 99%
Excellent sound absorption ability and co,petitive price.
Physical data
Raw materials:Wet-formed mineral fiber
Surface finish :Factory-applied vinyl latex paint
Fire performance:China A2 grade (meet GB8624-1997)
Density:3.6kg/m2
Content of Recycled material:50%
Standard sizes:
           1)   Imperial System size:              2'x2' or 2'x4' / 24"x24"/24"x48"                  
                  Imperial Actual size:   603mmx603mm    or   603mmx1214mm                     
           2)   Metric System size:     600mmx600mm    or   600mmx1200mm           
                  Metric Actual size:       593mmx593mm    or   593mmx1193mm             
           3)   actual sizes can be produced as per customers' request
Other sizes:  (300-450mm)x(1200mm-2400mm)x(15mm-20mm)
                           (12"-16")x(48"-96")x(3/5"-4/5")
Edge detail: 1) Angled Tegular    
                     2)Beveled Tegular    
                    3) Suqare Lay-in       
                    4) Exceed concealed     
Installation: When the building is dry enough and chemical gas disappears ,installation can be started.Make sure the temperature doesnt exceed 490 C and relative humility not exceed 99%.
Transportation and storage:When transporting,take care of the edge of the board.It will be better to lay the panels on dry backing-plate horizontally,about one meter away from the wall
Post Buying Request