Min. Order: | 150 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,DDP,DAP,FCA,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 1000 Sets/Month |
Place of Origin: | Shandong |
Location: | Weifang, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Agent, Distributor/Wholesaler, Service, Association, Other |
Model No.: | ESTYE-D016 |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | ESTYE |
Type: | Vertical Type |
Material: | Steel |
Feature: | Corrosion Protection |
Use: | storage |
Certification: | ISO9001:2000/CE/RoHS |
Depth: | 5000-8000mm |
Weight Capacity: | 4000kg/layer |
Width: | 800-1200mm |
Height: | 6000mm |
color: | international RAL color code |
Production Capacity: | 1000 Sets/Month |
Packing: | 1, Standard export package 2, Carton PP film or foam |
Delivery Date: | 15 days after 30% deposit |
steel drive in rack
Name | Drive in rack | Material | Steel |
Dimension | Customized | Color | Selective |
Depth | Customized | Weight Capacity | According to your needs |
Width | Customized | Height | Customized |
Finish | Powder coated/Galvanised | ||
Weld | Weld for automatic welding | ||
Rust | Surface antirust | ||
Certification | CE, AS4084, ISO9001:2008 | ||
Free Sample | Available (Delivery Cost on Buyer) | ||
OEM | Available |
1), Suitable for small variety but large quantity stored products, especially for standard goods;
2), Very high utility ratio of the warehouse;
3), Each aisle consists of several level of pallet support rail. Pallets are placed on pallet support rail one after another;
4), Forklifts operation alongside the aisle;
5), First-in-last-out access process, one side in/out or two side in/out can be met.
6), Top and back bracing are used to fix the whole racking, making the whole racking stable and safe;
7), first level pallets can be placed on the floor;
8), Surface treatment: powder painting;
9), Packing: Neutral paper box or in bulk or upon clients requirements
10), Different size available;
11), Container load:10-15 ton per 1x20 container, 20-25 ton per 1x40 container
12), Delivery time: 15 days for 1x20 container, 25 days for 1x40 container
13), Payment terms: By TT or sight LC
14), MOQ: 1X20 container
0
Steel Rack Beam
High load capacity up to 4200kg.
Manufactured with the highest quality steel.
Orange epoxy coated (RAL 2004).
Lengths available: 1850/2250/2700/3300/3600/3900mm
Boltless connection with 3 or 4 connector hooks.
A security pins per beam to prevent accidental dislodgement.
Powder coating finish
Frame
High load capacity up to 21000kg.
Frames include all the elements needed for assembly: bracing, feet and nuts & bolts
Blue epoxy coated (RAL 5017).
Standard heights : From 2 -11.5m
Adjusted by 50mm pitch.
Please inform us the following information for a clear quotation:
a), the CAD drawing of the warehouse (if available);
b), the estimated overall size of pallet after loading;
c), the weight of pallet after loading;
d), the height of the drive-in system;
e), how many levels to be;
f), RAL color code;
FAQ
Q: What's your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C O/A also available.
2) Lead time: normally in 20-25 days after deposit received.
3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Qingdao/Shanghai / Nanjing China.
5) Discounts: we offer good discount for large quantity.
Q: How I can delivery my goods?
1) Sea freight: we will update sea freight once we know your sea port where goods will be delivered.
2) Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange to deliver the items.
Q: What is your service?
1) Your inquiry related to our products or price will be replied in 12 hours.
2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
3) OEM & ODM, any your customized racking we can help you to design product.
4) We have very experienced professional engineers to make best solutions.
Q: What to purchase your product?
Design drawing →Confirm drawing→Quotation→PI→Confirm PI→Arrange 30%deposit→Manufacture→QC inspect→Pay balance→Shipping
Q: What's your advantage?
1) Payment: we can do O/A 40-60 days.
2) Lead time: rush order we can fast delivery.
3) Factory price: factory direct sale competitive price.
4) Warranty: Two years warranty, the broken parts will be replaced and sent to you.