user login

carton steel machined precision components processed cnc lathe turning

10.0~20.0 USD
Min. Order: 100 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 1000
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Precision Sheet Stamping Part, Lost Wax Investment Casting, Hydraulic Hose Pipe Fitting, Bearing Rubber Seals, Silicone Oil Seal

Product Detail

Model No.: FW07
Brand Name: no
Specification: FW07
Function: damping for fitness bike
Quality system: ISO9001:2008
Export country: Italy
Cooperative Company: Technogym
Process: cutting,cnc machining,drilling
Material: high carbon steel
Surface: White Zinc plating
Test: Static balancing and load
Export port: Ningbo
Production Capacity: 1000
Packing: carton/pallet
Delivery Date: 30days
Show

Product Description

Products: cnc lathe machined precision components
Decription:there are parts made in all kinds of metals,such as carbon steel AISI 1010,1020,1045,SAE1040,
      4140,4340, mild steel,easy cutting steel 1214,12L14,1215,stainless steel AISI303,304,316, 316L,  
aluminium 6160,copper or brass...
Main processes: forging or casting, machining(turning,milling or grinding), surface treatment(plating) or
heat treatment, anti-rust protection.
Machines available: lather,cnc lather,cnc milling, grinder, cnc center, wire cutting,
Quality control faclities:CPJ-300 projector, HR-150DT hardness, TR200 roughness test, EV2515 projector,
VMT250 projector, Height meter,Concentricity tester,Runout meter, VA-640 micro-Vikers hardness
tester,etc.
Application: they are widely used in all industrial,such as machinery,aerospace,sanitation,automobile...
Tolerance: depends on drawing requirements, the highest tolerance we're doing is 0.005mm.
Quality control flow: material in, inspection,lable and record;
                                     mateiral storage and distribution, lable and record;
                                     process and supervise according to Control Plan at operation spot;
                                     randem quality inspection by QC
                                     quality inspection in quality department before putting in warehouse

Process FMEA
high precison metal parts

Part Submission Warrant
high precison metal parts
Process Flow Diagram
high precison metal parts
Control Plan
automobile spline Shaft
if CPK analyse required,
automobile spline Shaft
Packing: cnc lathe machined precision components/carton/wood pallet
Lead time: 20days for initial samples or prototype
                     30-40days for first regular purchasing order
                     20days from the second orders
Post Buying Request