user login

alloy steel piston pin for air condition compressor processed by cylindrical and centerless grinding

0.3~0.5 USD
Min. Order: 10000 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 2000000
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Precision Sheet Stamping Part, Lost Wax Investment Casting, Hydraulic Hose Pipe Fitting, Bearing Rubber Seals, Silicone Oil Seal

Product Detail

Model No.: FP001
Means of Transport: Ocean, Air, Land
Brand Name: no
Specification: piston pin
Function: connect piston and valve stem
Quality system: iso9001:2008
Export Area: American and Europe
Material: alloy steel 4140
Process: cylindrical and centreless grinding
Surface: plain
Paperwork: PPAP
Dispatching port: Ningbo
Production Capacity: 2000000
Packing: carton/wooden pallet
Delivery Date: 30days
Show

Product Description

Products: alloy steel piston pin for air condition compressor  
Material:alloy steel 4140
Process: cylindrical and centerless grinding.
Heat treatment:  with or without according to customer's requirements
                              could be carburizing and quenching or induce heattreatment in special areas such as
                              positions for bearing mounted.
Application:connect piston and valve stem in air-conditioner compressor
Tolerance:    it depends on drawing requirements.
Quality control flow: material in, inspection,lable and record;
                                     mateiral storage and distribution, lable and record;
                                     process and supervise according to Control Plan at operation spot;
                                     randem quality inspection by QC
                                     quality inspection in quality department before putting in warehousepower transmission steel shaft
If required, we also have the alibity to do the CPK anylizing
power transmission steel shaft
Packing:    alloy steel piston pin/carton/wood pallet
Lead time: 20days for initial samples or prototype
                     30-40days for first regular purchasing order
                     20days from the second orders
Post Buying Request