user login

FeCrAl 1Cr13Al4 Gas Furnace Wire Mesh

Min. Order: 30 Square Meter
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 50000sq.m./Month
Place of Origin: Hebei

Company Profile

Location: Beijing, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Nickel Wire Mesh, Monel 400 Wire Mesh Demister, Incoloy Sheet Plate Strip, Monel Sheet Plate Strip, Inconel 625 Alloy Strip Sheet Plate

Product Detail

Means of Transport: Ocean, Air, Land
FeCrAl Heating Alloy 1Cr13Al4 Mesh: FeCrAl Heating Alloy 1Cr13Al4 Mesh
Production Capacity: 50000sq.m./Month
Packing: Standard package
Delivery Date: 2-30days
Show

Product Description

FeCrAl 1Cr13Al4 Gas Furnace Wire Mesh
Heanjia Super-metals Co., Ltd. supplies FeCrAl 1Cr13Al4 Gas Furnace Wire Mesh. FeCrAl 1Cr13Al4 Gas Furnace Wire Mesh is a ferritic iron-chromium-aluminium alloy (FeCrAl alloy) Mesh which has been developed for low temperature applications. It is suited for use in appliances and can replace all low temperature materials in such applications. Maximum operating temperature in continuous operation is 950°C.
Chemical Composition
Alloy
Cr%
Al%
Fe%
Re%
1Cr13Al4
20.5-23.5
4.2-5.3
Bal.
Adequacy

Properties
Alloy
Specific Resistance
(at 20°C)
(µΩ-m)
Hardness
HB
Linear Expansion Coeff.
(T=20 – 1000°C)
x10-6
Maximum Operating
Temperature of Element (°C)
1Cr13Al4
1.25±0.08
200-260
15.4
950
Mesh Specification
Wire Mesh
GB/T 5330.1 ; GB/T 17492 ; JB/T 9155
0.5-250 mesh/Inch; Thickness: Min0.05mm
Manufacture Process
The manufacture of mesh is started with producing wire. The wire production includes: forging, rolling, annealing and drawing. The wire with right material and wire diameter will be produced. Then the warp wires will be put and prepared on the weaving machine, and then start weaving. From wire to mesh, manufacture process is operated with high standard quality control system. There will be quality test for each batch of product, such as test to diameter tolerance, content, mesh aperture, etc.
Packing Process & Transportation
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation: By air or By sea
Other Terms
Minimum Order Quantity
Manufacture Period
Payment Terms
100 KG
10-15 Days (Small Quantity)
20-40 Days (Mass Quantity)
L/C, T/T, Western Union
Post Buying Request