user login

1Cr13Al4 Resistance Heating Wire

Min. Order: 50 Kilogram
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 2 Tons/Month
Place of Origin: Beijing

Company Profile

Location: Beijing, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Nickel Wire Mesh, Monel 400 Wire Mesh Demister, Incoloy Sheet Plate Strip, Monel Sheet Plate Strip, Inconel 625 Alloy Strip Sheet Plate

Product Detail

Means of Transport: Ocean, Air, Land
FeCrAl Resistance Wire: FeCrAl Furnace Wire
Production Capacity: 2 Tons/Month
Packing: Standard Package
Delivery Date: 3-30 Days
Show

Product Description

1Cr13Al4   Resistance Heating    Wire

1Cr13Al4 Resistance Heating Wire is supplied by Heanjia Super-metals Co. Ltd..

1Cr13Al4 Resistance Heating Wire
is a ferritic iron-chromium-aluminium alloy (FeCrAl alloy) Wire which has been developed for low temperature applications. It is suited for use in appliances and can replace all low temperature materials in such applications. Maximum operating temperature in continuous operation is 950°C.

Chemical Composition
Alloy
Cr%
Al%
Fe%
Re%
1Cr13Al4
20.5-23.5
4.2-5.3
Bal.
Adequacy

Properties
Alloy
Specific Resistance
(at 20°C)
(µΩ-m)
Hardness
HB
Linear Expansion Coeff.
(T=20 – 1000°C)
x10-6
Maximum Operating
Temperature of Element (°C)
1Cr13Al4
1.25±0.08
200-260
15.4
950

Wire Specification
Wire
CNS 2962-1984
Diameter:0.05mm-10.0mm,
0.002 Inch to 0.3937 Inch

Product Description:
The product produced by us is of good quality and is priced reasonably.
Competitive price: The labour cost and cost on procuring the raw materials is low and hence the manufacturing cost is reasonable. We provide high facility in short producing cycle and have strong adaptive capacity in producing variation of products.
High quality assured: The work done by us has a good command of advanced technological process in the respect of smelting, rolling, drawing and heat treatment up to finished products. The chemical analysis department, the physical testing department and the quality control department all operate an all-round monitoring of our products from raw materials to final products.

Packing Process & Transportation:
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation:     By air:   Beijing International Airport    OR        By sea:   Trianjin Seaport

We provide our customers with excellent services. If you want more detailed information of this product or related problems, please contact with us, we will reply as soon as possible (general in 24 hours).

Other Terms
Minimum Order Quantity
Manufacture Period
Payment Terms
50 KG
10-15 Days (Small Quantity)
20-40 Days (Mass Quantity)
L/C, T/T, Western Union



Post Buying Request