0Cr21Al6NbResistance Heating Alloy Wire
0Cr21Al6Nb Resistance Heating Alloy Wire is supplied by Heanjia Super-metals Co., Ltd.
The
0Cr21Al6Nb Resistance Heating Alloy Wire with the characteristics of high resistance, low temperature coefficient of
electric resistance, high operating temperature, good corrosion resistance under high temperature, as well as the lower price, it is widely used in industrial electric furnace, household electrical appliance and far infrared ray device.
Our FeCrAl alloy wire and strip have outstanding thermal stability and mechanical properties by applying the following techniques:
1. Applying the double electro slag refining technique and special control inclusion technique.
2. Adding rare earth element: increase the FeCrAl alloy's whole properties, such as max working temperature and continuous working life.
The FeCrAl alloy wire and strip received favorable comments from Japan, US and Europe market.
Chemical Composition (%) and Properties
Type | 0Cr21Al6Nb |
Chemical composition | Cr | 21.0-23.0 |
Al | 5.0-7.0 |
Re | opportune |
Fe | Rest |
Maximal Temperature (oC) | 1350 |
Resistivity 20oC (10-6ohm*m) | 1.45 |
Density(g/cm3) | 7.1 |
Thermal conductivity (KJ/m*h*oC) | 46.1 |
Extend strength (a*10-6/oC) | 16 |
Melting point ( oC) | 1510 |
Tensile strength(N/mm2) | 650-800 |
Percentage elongation (%)) | >12 |
Section shrink rate(%) | 65-75 |
curve strength(F/R) | >5 |
hardness (H.B.) | 200-260 |
Microstructure | Ferrite |
Magnetism | Magnetic |
Wire Specification
Wire | CNS 2962-1984 | Diameter:0.05mm-10.0mm, 0.002 Inch to 0.3937 Inch |
Product Description: The product produced by us is of good quality and is priced reasonably.
Competitive price: The labour cost and cost on procuring the raw materials is low and hence the manufacturing cost is reasonable. We provide high facility in short producing cycle and have strong adaptive capacity in producing variation of products.
High quality assured: The work done by us has a good command of advanced technological process in the respect of smelting, rolling, drawing and heat treatment up to finished products. The chemical analysis department, the physical testing department and the quality control department all operate an all-round monitoring of our products from raw materials to final products.
Packing Process & Transportation:
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation: By air: Beijing International Airport OR By sea: Trianjin Seaport
We provide our customers with excellent services. If you want more detailed information of this product or related problems, please contact with us, we will reply as soon as possible (general in 24 hours).
Other Terms
Minimum Order Quantity | Manufacture Period | Payment Terms |
50 KG | 10-15 Days (Small Quantity) | 20-40 Days (Mass Quantity) | L/C, T/T, Western Union |