user login

High Temperature Resistance Heating Wire 1415°C

Min. Order: 50 Kilogram
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 20 Tons/Month
Place of Origin: Beijing

Company Profile

Location: Beijing, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Nickel Wire Mesh, Monel 400 Wire Mesh Demister, Incoloy Sheet Plate Strip, Monel Sheet Plate Strip, Inconel 625 Alloy Strip Sheet Plate

Product Detail

Means of Transport: Ocean, Air, Land
High temperature FeCrAl Resistance Wire: Replacing Kanthal AMP A-1 resistance wire
Production Capacity: 20 Tons/Month
Packing: Coil and Sealed up
Delivery Date: 3-30 days
Show

Product Description


The Super High Temperature Resistance Heating Wireis developed by our company. The product has passed the RoHs test done by SGS. The max. working temperature is about 1415°C

The heating alloys operated above 1400°C has relied on the product produced in Sweden. The price is expensive, this brings big pressure on manufactures of high temperature electric heating stove and other heating elements. Though the resistance wire of 0Cr27Al7Mo2 can work under relatively high temperature, its machinability is bad. This new product has sucessfully solved the technical problems while reducing the cost.

Applied techniques of High Temperatrue Resistance Heating Wire :
  1.Using electro slag refining technique and special control inclusion technique,
  2. Using powder metallurgy.

Properties below of High Temperatrue Resistance Heating Wire :
Max. Temp
Resistivity (20°C)
Density
Melting Point
Elongation
Accelerated life test (1400°C.h)
Number of Bends
Magnetic
1415°C
1.4-1.52u·Ω·m
7.10g/cm3
1500°C
16-33%
>80
7-12
Yes
Resistance-temperature coefficient (Ct)
800°C
1000°C
1200°C
1.03
1.04
1.04
Tensile Strength(Annealed)
650-800N/mm2

Product Description:
The product produced by us is of good quality and is priced reasonably.
Competitive price: The labour cost and cost on procuring the raw materials is low and hence the manufacturing cost is reasonable. We provide high facility in short producing cycle and have strong adaptive capacity in producing variation of products.
High quality assured: The work done by us has a good command of advanced technological process in the respect of smelting, rolling, drawing and heat treatment up to finished products. The chemical analysis department, the physical testing department and the quality control department all operate an all-round monitoring of our products from raw materials to final products.

Packing Process & Transportation
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation:     By air:   Beijing International Airport    OR        By sea:   Trianjin Seaport

Other Terms
Minimum Order Quantity
Manufacture Period
Payment Terms
50 KG
10-15 Days (Small Quantity)
20-40 Days (Mass Quantity)
L/C, T/T, Western Union

Post Buying Request