user login

sino-tec cooling tower

1000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 500
Place of Origin: Chongqing

Company Profile

Location: China (Mainland)
Business Type: Manufacturer, Trading Company, Distributor/Wholesaler, Service

Product Detail

Model No.: sino
Means of Transport: Ocean
Category: Cooling Tower
Capacity Type: Heavy Duty
Certification: CE
Brand Name: sino
cooling tower: cooling tower
Production Capacity: 500
Packing: packing
Delivery Date: 15 days
Show

Product Description

.Use notes when the water flow into the tower water temperature, water temperature out of the tower, the design of air wet bulb temperature, thermal performance curve determined according to the specifications of the tower, or to submit the parameters of our company, find the tower specifications.

2. There is antifreeze request should be informed in advance when ordering. Increase in cooling tower water spray deflector ring.


3. User requirements of installing water catchment tray in the cooling tower, the need to install the "Auto fill water", "rapid fill water", "sewage vent pipe", "overflow pipes." Corresponding increase in the price of the tower.

4. Foundation bolt holes can be set aside, can also be embedded steel. R0 at the basis of the figure, only the ultra-low-noise tower only. The direction of the tower and out of control Do not touch the foundation. Out of control under the small tower should be a separate basis.

5. tower water pressure is about 40-60Kpa. If more than ± 15% of water should be requested.

6. Circulating water turbidity shall not exceed 50mg / l, short of not more than 100mg / 1, should not be contaminated by oil and mechanical impurities, if necessary, need to take measures for water quality stability and algae.

7.tower water temperature should not exceed 60 ℃, if exceeded, should be requested.

8. Cooling tower should be the first to open the pump starts to open after the fan, fan shut down after the first stop should stop the pump.
9. Fan motors with two types of: a single speed and two-speed , orders which motors should be requested in advance. Motor control cabinet is not a scope of supply, for delivery, orders should be requested in advance too.
Post Buying Request